First 60MW Power Generation Systems runs live

Proeon Systems is pleased to announce the completion of commissioning on the first of two GEC EM610 Gas Turbines installed in Hong Kong.

 

Proeon Systems supplied the core engine control software for the 2 off standby generators installed in  a power station together with the supply of a hardware and software in the loop simulation package for the engines to speed up integration testing.